Road construction works (2nd category engineering structure) in the territory of the solar power station “Acone”: installation and extension of culverts (185 m), construction of the road base (2452 m³), construction of the road surface (997 m³), installation of protective pipes (D=160 mm and D=110 mm) under the road (1677 m), and installation of flat steel under the road (181 m).