Concrete floor demolition works were carried out inside the existing building, covering an area of 916 m². The concrete was crushed and transported to a temporary storage area.

In addition, construction waste was crushed and processed for recycling using a crushing machine. The crushed materials were reused for ground filling and terrain leveling, in agreement with the client.

Additional works included excavation of trenches for water pipeline installation and floor profiling, ensuring accurate base preparation for further construction works.