Demolition of the Fuel Filling Station Shop Building

Demolition of the Fuel Filling Station Shop Building
Demolition of the Fuel Filling Station Shop Building

The demolition of the fuel filling station shop building was carried out, including the dismantling of paving in the surrounding area, which was preserved for reuse.

The works were performed with special care, as a functioning fuel filling station was located next to the site. During the demolition process, continuous monitoring of the surrounding structures was carried out to ensure their stability and safety.

Particular attention was given to the protection of existing trees, ensuring their preservation during the works.

Technical data:

  • Number of floors: 1

  • Building footprint area: 211.6 m²